Project realized.
Built in 2011, the aqua park includes a sport area with a 25m long pool, a recreational pool with various attractions, a tube slide and a sauna area.
Project realized.
Built in 2011, the aqua park includes a sport area with a 25m long pool, a recreational pool with various attractions, a tube slide and a sauna area.