Aquapark Częstochowa (2017)
Conceptual design. The water park was to be located on the Dekabrarist Street in Częstochowa. The conceptual project...
Conceptual design. The water park was to be located on the Dekabrarist Street in Częstochowa. The conceptual project...
Project in progress; Planned date of the end of the construction works is year 2019. The project was...
The project is being built at the moment; launch of the facility is planned for the second half...
The object was to be erected in Mieliec. Its main function would be a sports and concert hall...
The concept design of the Aquapark which was to be erected in the town of Kępno. It included...
Swimming pool at ul. Szarych Szeregów, near high school no.IV, are to be opened in summer 2019.
Project realized. The pool located in Morąg and was opened in 2016. There is a 25-metre sport pool,...
Conceptual design of the sports hall which was to be created at the campus of the University of...
The design project of leisure and business complex in Brenna in the Carpathian mountains. Located right next to...