The project is being built at the moment; launch of the facility is planned for the second half of 2019. The building was designed to be very economical, which allowed to lower than usual total cost of PLN 18 million. However, it still includes 25m sports pool, a recreational area with a part for the youngest children, a tube slide and a small sauna area.

Leave a Reply

Your email address will not be published. Required fields are marked *

Back to Top